From Monday, July 15, the Saint-Charles swimming pool will close for equipment replacement as part of an ongoing energy optimisation process.
Upgrades will include that of the pool treatment plant, the heat pump for water heating (especially for ‘baby swimming’ sessions), and the centralised technical management system for temperature regulation of both air and water.
During this period, the Rainier III Nautical Stadium Swimming Pool will remain open throughout the summer.